Every change you make after demolition costs more than the same change made on paper, and a good kitchen remodel planning checklist exists to move as many decisions as possible into the cheap phase.
The cabinet maker KraftMaid puts it plainly. It’s “easier and far less expensive to try out ideas on paper than it is to change course after you order materials and begin construction.”
Below are 20 decisions, grouped so you can work through them in order. Some take ten minutes. A few will take weeks, which is why the list starts early.

Cover photo by ErikaWittlieb on Pixabay
Budget, rules and scope: the kitchen remodel planning checklist
Start here, because every later choice on your kitchen remodel planning checklist is limited by these five.
- Your total kitchen remodel budget. A designer quoted by Real Homes says the National Kitchen and Bath Association recommends spending 10 to 25 percent of your home’s value on a kitchen remodel. Pick your number before you pick a single finish.
- A contingency. Old wiring that isn’t up to code can push a budget up once walls open, so hold some money back rather than spending every dollar on the design.
- How you’ll pay. Cash, a home equity product or a renovation mortgage each change the timing of your decisions. Our guide to renovation loan options explains how the main ones work.
- Who pulls the permits. In Boston, the city’s permitting page says only a contractor with a valid Massachusetts trade license may apply for plumbing, electrical or sheet metal permits and do that work. Your own town sets its own process, so ask its building department what a kitchen needs.
- The scope line. Decide what’s in and what’s out: new surfaces over the same layout, or walls moving. Boston treats moving structural walls or creating a new window or doorway as a bigger permit than a simple renovation, and the same logic applies to your schedule and price anywhere.
A fair question to ask every contractor is how they’d handle the first four. One of our customers, Andy Golden, wrote that “They did a beautiful job for less than the other 10 quotes we received, and several neighbors asked for his info to do their wall, as well as several friends to do interior work.”
Once the five are settled, write down your non-negotiables. Real Homes quotes designer Gabby Koontz on how many to keep: “Five is perfect.” Ten, in her view, is too many. A short list gives you something to defend when the budget gets tight, and everything off it can flex.
Disposal is worth a line in the budget too. Real Homes points out that many municipalities charge for construction waste disposal, and a homeowner doing the work themselves should check with the local building official before starting. In most remodels, the contractor pulls the permits and includes their cost in the bid.
Good kitchen renovation planning also means knowing which kitchen remodel permits your town expects before a contractor quotes the job.
Put every one of these answers in writing, in a single document. A kitchen remodel planning checklist that lives in four text threads gets lost the first time a supplier changes a date.
Kitchen layout planning that changes the plumbing
Kitchen layout planning is where a kitchen’s real cost is set. Moving a sink or a range means moving pipes, gas lines or circuits, and that’s trade labor you can avoid by keeping the footprint.
- Keep the sink where it is, or move it. Moving it is the single decision most likely to open the floor.
- Keep or remove a wall. Real Homes warns that clients forget a removed wall leaves a gap in the hardwood floor and the ceiling that someone has to patch.
- Where people will walk. Tape the new layout on the floor and walk it while carrying a pot. If two people can’t pass at the stove and the fridge, adjust now.
- Where everything gets stored. List what lives in the kitchen today, including the small appliances, and make sure each item has a home in the new plan.
- Island, peninsula or neither. Seating is lovely, but an island that crowds the walkway makes a kitchen worse than the one you started with.
If you’re also thinking about opening the kitchen to a new room or bumping it out, our home renovations and additions page shows how we handle projects that change a home’s footprint.
Kitchen remodel planning checklist items to order before demolition
Cabinets are the longest wait and the biggest line in most budgets. Real Homes, citing the same association, says new cabinets could take as much as 35 percent of your budget.
On timing, KraftMaid says its cabinets “will take a minimum of 4 weeks to arrive.” That’s a minimum, so the order date is a decision of its own, and kitchen cabinet lead time should drive your demolition date, not the other way round.
- Cabinet line and layout. Stock, semi-custom or custom changes both the price and the wait.
- Appliance models. Choose them before the cabinets are final, since the exact sizes decide the cabinet openings.
- Countertop material. Countertops are measured after the cabinets are installed, so you need the material chosen but the template comes later.
- Flooring. Decide whether it runs under the cabinets or stops at them, and order it with everything else.
- Hardware and finishes. Knobs and pulls are small, but sizes and finishes affect how the doors look. Our look at cabinet hardware finishes, shapes and sizing can narrow the choice.
Ordering early has a practical payoff. Cabinets, fixtures, flooring and appliances arrive while the old kitchen is still standing, and KraftMaid’s sequence puts those purchases ahead of demolition so nothing holds up the crew once the walls are open.
The details people forget

These last five rarely come up while you’re picking finishes, yet a good kitchen remodel planning checklist includes them. Each is easy to settle on paper and awkward to retrofit.
- Lighting. Plan general light, light over the counters and light over the island or table before the walls are closed.
- Outlets and ventilation. Decide where each plug goes and where the range hood vents, since both are built into the walls.
- Sink and faucet. The sink size has to fit the cabinet, and the faucet has to fit the sink’s holes.
- Heated floors. If you want them, they go under the finished floor, so the decision can’t wait. Our guide to radiant floor heating cost and comfort covers what to expect.
- A temporary kitchen. KraftMaid’s own timeline lists boxing up your dishes and setting up a temporary kitchen among the steps before work begins, along with where the kids will eat and how to keep pets safe.
For the weeks you’ll spend cooking in a hallway, our post on living through a renovation has practical ideas.
How the timeline runs once decisions are made
KraftMaid’s timeline lists demolition, plumbing, electric and HVAC rough-in, drywall and painting as a few days to two weeks of work, then four to six weeks for the cabinets, flooring, counters and finish carpentry. It warns you to expect surprises and delays during demolition.
A contractor who keeps you informed makes that stretch easier. Jodi Smith, one of our customers, wrote that “It was refreshing to deal with a contractor that was on time and showed up when he said, ALWAYS kept me up to date on the work.”
Finish your kitchen remodel planning checklist by confirming every long-lead item has an order date and a delivery date before anyone swings a hammer. If you’d like help turning your answers into a plan, see how we approach kitchen remodeling.
Frequently asked questions
Do I need a permit for a kitchen remodel in Massachusetts?
Often, yes, and it’s the first line on any kitchen remodel planning checklist. Boston’s permitting page says you’ll need several permits for a kitchen renovation, and rules differ by town, so check with your local building department before planning the work.
How much should I budget for a kitchen remodel?
The National Kitchen and Bath Association recommends 10 to 25 percent of your home’s value, as quoted by Real Homes. Keep part of it in reserve for surprises.
How long do kitchen cabinets take to arrive?
KraftMaid says a minimum of four weeks for its cabinets. Order early so the delivery date is fixed before demolition.
Sources
- Kitchen remodel costs: Average spend, how to budget, and ways to save — Real Homes
- Renovate a bathroom or kitchen — City of Boston
- Project timeline — KraftMaid